Updates
PROJECT CASE STUDIES
Pyrotek
What a historic milestone captured! Here is the very first train travelling through the Sydney Metro City & Southwest tunnel, 40 metres below the surface under the Sydney Harbour.
PROJECT CASE STUDIES
Pyrotek
Trains to convert natural gas into liquefied natural gas experience high heat differentials.
PROJECT CASE STUDIES
Pyrotek
Thermal efficiency in this sector can be improved by providing specialty valve and flange covers to help maintain the correct temperature of gas as it moves through the processing facility.
PROJECT CASE STUDIES
Pyrotek
Manufacturing equipment generates heat and thus large, industrial air-cooling units are used to cool areas where required.
NEWS
Commercial Systems Australia
At CSA we recognise the importance of environmental protection and sustainability.
TIPS
FIREFLY
New tested system for copper pipes through a concrete, masonry or hebel floor.
PROJECT CASE STUDIES
FIREFLY
As an architect, specifying the right materials is crucial in protecting your clients' properties and lives, especially in bushfire-prone areas.
NEWS
FIREFLY
Are you up-to-date on the latest NCC 2022 requirements for wall cladding?
EDUCATION
FIREFLY
TBA Firefly™ Intubatt® is a tested system that allows for a 40% reduction in concrete thickness while maintaining structural adequacy and 4 hr fire resistance, resulting in cost savings and greater Fire Resistance Levels for retrofit applications.
PROJECT CASE STUDIES
Moddex
Located in Brisbane’s western suburbs, the Toowong State School has been serving the local community for over 140 years.