
Cambridge High School Enhances Safety and Accessibility with Moddex Handrail Systems
Cambridge High School, an educational institution in New Zealand, undertook a critical infrastructure upgrade to enhance the safety and accessibility of its campus. Recognising the need for compliant safety solutions, the school focused on improving high-traffic areas, including staircases, ramps, and walkways, where the risk of accidents was higher.

Highbury Triangle Senior Housing Development: A Case Study in Accessibility & Compliance
The Highbury Triangle Senior Housing Development is a community-focused project designed to provide a safe and accessible environment for elderly residents, particularly targeting the health, social, and wellbeing needs. Given the mobility challenges faced by many tenants, the development required a reliable handrail and balustrade system that met strict compliance standards while ensuring long-term durability and ease of use.

Register now for the 2024 American Institute of Architects International Conference!
What kind of architects and architecture do we need?
To answer this important question, the 2024 AIA International Conference will gather architects and designers from around the world to consider where the profession is today - and where it should be heading tomorrow - in one of the world's most fascinating cities, Hong Kong.
Our Insightful Articles
PROJECT
1 YEAR AGO
In the heart of Sydney's Circular Quay, Quay Quarter Tower stood at the crossroads of its life cycle. Instead of demolishing the building, the architects and designers at 3XN & BVN embraced a bold vision to repurpose and recycle the building. The result was a stunning display of sustainable design and a beacon of hope for a greener future.
PROJECT
1 YEAR AGO
Existing Synpave courts were recoated using COOLTOP.
PROJECT
1 YEAR AGO
Multiple Sanifos 280 were brought in as a solution for the decommissioning of aging and deteriorating septic systems servicing properties at Lake Rotoiti, NZ. The Sanifos 280’s pump waste up to the new bio treatment systems on the top end of the properties.
PROJECT
1 YEAR AGO
Multiple Sanifos 280 were brought in as a solution for the decommissioning of aging and deteriorating septic systems servicing properties at Lake Rotoiti, NZ. The Sanifos 280’s pump waste up to the new bio treatment systems on the top end of the properties.
PROJECT
2 YEARS AGO
In order to create these unique spaces, complete with a bathroom and kitchenette, renovators need the help of a recent Saniflo product, the Sanicubic 1GR.
PROJECT
2 YEARS AGO
Completed in June 2017, a new Sydney Seaplane terminal brings the beloved back to Rose Bay. PENETRON ADMIX was used in the precast elements to ensure impermeability for a structure built wholly over seawater.
PROJECT
2 YEARS AGO
The SANICUBIC 1: An integral part of Joost Bakker’s future food system, Greenhouse.
PROJECT
2 YEARS AGO
One of the most exciting developments in architecture is the resurgence of timber and the innovative construction of tall wooden buildings.
PROJECT
2 YEARS AGO
The Chapman Tripp office space is so much more than just a commercial building. Inside and out, the structure is a pinnacle of inspiring design work. Situated in the heart of Wellington, this stunning workplace features a modern blend of private spaces and a flexible open floor plan supported by the latest technological advances.
PROJECT
2 YEARS AGO
Kerakoll would like to share their driven commitment to sustainable growth “There is no value in industrial success if there is no commitment to sustainable development.” Kerakoll has achieved excellent results, the best ever, actually – confirming and boosting all their projects.
PROJECT
2 YEARS AGO
A prestigious new Sydney residential apartment development has been fitted with Doric’s new award-winning Ventus automated ventilation system.
PROJECT
2 YEARS AGO
The new Arncliffe Youth Centre, providing a local community hub for Sydney’s southern suburbs, is now completed.