Updates
PROJECT CASE STUDIES
Equus Industries
A mostly underground home at the foot of Mt John in the lake town of Tekapo, Canterbury, the Bunker House fits perfectly into the landscape just as it was designed to. Tekapo is located in the centre of the Aoraki MacKenzie International Dark Sky Reserve, the largest dark sky reserve in the Southern Hemisphere.
OTHER
Moddex
In the world of architecture, wearing multiple hats is a daily reality. One minute you’re meticulously sketching the perfect building design, the next you’re specifying safety barrier systems, such as prefabricated handrails and balustrades in Australia and New Zealand, that meet stringent building codes and complement the overall aesthetic.
PROJECT CASE STUDIES
Moddex
In the Bellgrove Subdivision Development Project, Moddex collaborated directly with the developer, Bellgrove Rangiora Limited (BRL) in join venture with Ngāi Tahu Property, to deliver a crucial safety barrier solution.
NEWS
Blum
The new AVENTOS HKi integrated lift system helps you make the most of glass-fronted cabinet designs.
PROJECT CASE STUDIES
Moddex
The Hurlstone Park Wanderers, a prominent local football club, celebrated the opening of their new state-of-the-art facility at Ewen Park in March, 2024.
NEWS
Moddex
In a significant achievement for safety and compliance, Moddex proudly acknowledges being Tōtika certified.
PROJECT CASE STUDIES
Graphic Concrete
The Embassy of the Republic of Indonesia in Tokyo has recently completed reconstruction, marking an extraordinary fusion of tradition and innovation.
NEWS
Moddex
In the ever-evolving landscape of construction and infrastructure development, the significance of comprehensive engineering support cannot be overstated. Moddex stands at the forefront of innovation in this sector, celebrated as the leading manufacturer of pre-engineered handrail, balustrade, and walkway systems.
PROJECT CASE STUDIES
Moddex
Bridge 12, located in Springfield, spans 205m. The bridge faced significant safety concerns due to its deteriorating timber walkway and handrail falling below the required height standards. This deterioration necessitated immediate attention to ensure the safety of Kiwirail teams working on the bridge.
PROJECT CASE STUDIES
Megafloor
Get in touch for a quote, big or small we can have a chat.