641 results for "m" in Articles
PROJECT CASE STUDIES
1 YEAR AGO
Durable and beautiful - Contact us for your polished concrete projectsThe right flooring system makes the difference in results.
PROJECT CASE STUDIES
1 YEAR AGO
Very nice urban gloss job completed on an old slab in an office building.
PROJECT CASE STUDIES
1 YEAR AGO
Get in touch for your Commercial, industrial and residential projects.
PROJECT CASE STUDIES
1 YEAR AGO
This one was an exceptionally satisfying job, the finish was unbelievable.
PROJECT CASE STUDIES
1 YEAR AGO
See the results for yourself with these before and after pictures.
NEWS
1 YEAR AGO
In Australia, the AS1428.1:2021 Standard outlines guidelines for accessible design and construction, covering various elements such as pathways, ramps, stairways, handrails, circulation spaces, and amenities catering to wheelchair users and those with limited mobility.
NEWS
1 YEAR AGO
The Disability Discrimination Act (DDA) plays a crucial role in promoting a society where everyone can participate fully. The legislation focuses on eliminating discrimination based on disability and ensuring equal access to public spaces.
NEWS
1 YEAR AGO
Moddex strives at the forefront of innovation and professional culture. This commitment has not only earned Moddex a stellar reputation in the industry but also recognition as a top workplace in Australia, showcasing its dedication to creating an environment that fosters growth, innovation, and satisfaction.
NEWS
1 YEAR AGO
Within the construction and design industry, the ongoing search for innovative materials and systems that combine durability, ease of installation, and adherence to compliance and safety standards is an ongoing challenge.
PROJECT CASE STUDIES
1 YEAR AGO
Spearheaded by the Port Wakefield to Port Augusta (PW2PA) Alliance, in collaboration with the Government of South Australia – Department of Infrastructure & Transport, the recently completed Joy Baluch AM Bridge Duplication Project is a new important link in Australia’s National Land Transport Network.
NEWS
1 YEAR AGO
The construction and infrastructure industries are increasingly turning towards offsite manufacturing and prefabrication methods. This shift, driven by the need for speed, cost-efficiency, sustainability, and quality, is revolutionizing how projects are executed.
PROJECT CASE STUDIES
1 YEAR AGO
The $12.4 million new classroom block at Cambridge High School stood as an exciting and much-needed project constructed by Livingstone Builders.
PROJECT
1 YEAR AGO
While ensuring safety and compliance at height were undoubtedly crucial aspects of the Cambridge High School project, aesthetics also held significant importance.
PROJECT
1 YEAR AGO
Nestled in the heart of Fitzroy, Victoria, the Wurun Senior Campus stands as a beacon of modern architectural ingenuity, winning the prestigious title of Best Secondary School at the esteemed 2022 Victorian School Awards.
PROJECT
1 YEAR AGO
To further cement our love of the game and our hero Matildas captain, Sam Kerr, EA Sports launched the Sam Kerr Football Pitch as part of their FC Futures program. Officially opened on 8th August, the pitch is located in the heart of the football community at PCYC (Police Citizens Youth Clubs NSW) in Auburn, NSW.
PROJECT CASE STUDIES
1 YEAR AGO
That's what ECOTONE aims to deliver with our innovative colour matching technology.
NEWS
1 YEAR AGO
In the quest for durability and aesthetic appeal in building interiors and exteriors, the choice between stain and paint is a significant decision for architects and builders.
PROJECT CASE STUDIES
1 YEAR AGO
Moving people and goods smoothly is key to a city’s success. To keep up with growing economies and more people living in cities, it’s important to have a good, lasting transport system.
PROJECT CASE STUDIES
1 YEAR AGO
As a part of Victoria’s largest-ever single investment in upgrading specialist schools, Nelson Park School in Bell Park, Geelong was one of 39 specialist schools to share $388.8 million in 2020-21.
PROJECT CASE STUDIES
1 YEAR AGO
Marchwiel Street in Timaru required a safety balustrade installed along the edge of a high retaining wall.
PROJECT CASE STUDIES
1 YEAR AGO
The need for safety and fall prevention are just two of the unique challenges that designers and specifiers must address when creating bridges and overpasses.
NEWS
1 YEAR AGO
At Moddex, we are always looking for a better way; how we can make things safer, easier, and long-lasting.
NEWS
1 YEAR AGO
The Moddex Ezibilt™ Ramp, stair & walkway System is the ultimate pre-engineered, offsite manufactured solution for fast-tracked and compliant construction of accessibility ramps.