-
Hong Kong SAR
Copyright © 2025 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
06 May 2025 by Fosroc
Products
The boundary control point with direct access facilities, a 450-space public carpark, a public transport interchange. The Boundary point carpark allows citizens to park and travel to mainland China and is the first in Hong Kong. It is fully booked since its first day of operations, and with such high frequency of uses, a heavy duty and durable carpark flooring system is required.
THE PROJECT
As one of the key boundary point between China and Hong Kong, the project mainly comprises site formation of about 23 hectares of land for provision of Boundary Control Point (BCP) buildings and associated facilities, construction of about 11km long dual 2-lane Connecting Road linking up the BCP with Fanling Highway, design and construction of the Hong Kong Special Administrative Region portion of vehicular bridges and pedestrian bridge crossing Shenzhen River, associated diversion/modification works at existing local roads and junctions, drainage, sewerage, waterworks and landscaping works.
THE SOLUTION
The Boundary point carpark allows citizens to park and travel to mainland China and is the first in Hong Kong. It is fully booked since its first day of operations, and with such high frequency of uses, a heavy duty and durable carpark flooring system is required. As per the requirement of heavy duty flooring system for ramps and traffic deck, our Fosroc ET Slurry anti-skid flooring system and Trafficguard UR150 with Nitoflor EU5 carpark decking system were fulfilling the needs. Nitoflor EU5 high strength underlayment provided a high strength and smoothing floors to receive Trafficguard UR150, which is heavy duty traffic system designed to provide an added level of protection to, new and existing, trafficked areas. Nitoflor ET Slurry is used for making a flexible, waterproof, lightweight anti-skid wearing course for the heavy traffic ramps and also the high frequency use Public Transport Interchange.
THE BENEFITS
With this high frequency of use, the Trafficguard and Nitoflor ET Slurry system have proven to be a resilient and durable traffic deck system suitable for the project. The fire retardant property also enhance the client's concern on safety as the carpark are fully equipped with Electrical charging points for Electrical cars which is the trend in the market.
Application of Trafficguard UR150 with Nitoflor EU5 Heavy Duty carpark decking system. system
With extensive Electrical charging points, the Trafficguard UR150 ‘s fire retardant property is a benefit for safety concerns.
The carpark is fully occupied at all times.
Nitoflor ET Slurry anti-skid flooring system for public transport interchange.