-
Hong Kong SAR
Copyright © 2025 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
The expansion project at United Christian Hospital is setting new benchmarks in fire safety and energy efficiency, thanks to the extensive use of Promat’s advanced passive fire protection systems.
4-Hour Integrity and Insulation Duct Cladding
A key highlight of the project is the installation of over 26,000 m² of duct cladding, designed to deliver 4-hour fire integrity and insulation performance. This robust solution ensures critical ventilation systems remain protected during fire incidents, while also providing superior thermal insulation to optimize energy consumption.


2-Hour Integrity and Insulation Access Panel System
Complementing the duct cladding, more than 1,500 m² of Promat’s access panel system has been integrated. Engineered for 2-hour fire resistance and insulation, these panels allow safe and efficient access for maintenance without compromising the integrity of the fire protection system.

